Request a call back 0161 962 7261 Designed, supplied and installed by our team since 1986
Book
Dark handleless kitchen opening into a glazed garden room, designed and installed by Suga Küchen
★★★★★ on Google Since 1986 2,302 kitchens KBSA Approved Member

Plan the kitchen before the walls go up.

Kitchen design for extensions in Manchester and Cheshire

Kitchen designer reviewing extension plans with clients

Why the kitchen should be planned with the extension

In an extension, the kitchen decides where a lot of other things need to go: the gas, water and waste, the sockets, the extraction and sometimes the windows. If the kitchen is planned after the shell is up, some of those decisions are already fixed in brick and plaster. Bring us in at concept stage, before the planning and building regulations drawings, and the building can work around the kitchen.

Three points where we work with your architect

We work alongside your architect and builder at three points in the project. Each one is there to make sure what gets built matches what's been designed.

01

Concept-stage conversation

Before the drawings are finalised, we talk through how you'll use the room and model where the kitchen, island and tall units could go, including the ceiling height along the whole run.

02

Services brief

We give your architect a services overlay drawing and a zoning brief for their package, showing where water, waste, gas, power and extraction need to be.

03

First-fix confirmation visit

When the services go in, before anything is plastered over, we visit to check they're where the design needs them, while moving them is still quick and cheap.

Danil checking first-fix services in a kitchen extension

What goes wrong when the kitchen comes last

Three things catch extension kitchens out. Services end up in the wrong place, ceilings end up too low for tall units once ventilation ducting goes in, and floor levels don't allow for underfloor heating screed. Rerouting a soil stack after the event can cost around £800, against about £80 if it's planned from the start. As Danil puts it, "The word I'd use is sequencing."

Dark handleless kitchen with an island in a Timperley extension with rooflights

Already built? We can still help

If your extension is already up, that's normal. Most of our extension clients first get in touch at that point. Our survey measures how straight the walls are, the floor levels and the ceiling heights, and records where every service comes in. Nothing is assumed from the architect's drawings alone. In Timperley, we reworked a design from another company with a new layout, an island and a pantry.

Danil from Suga Küchen on site with a builder during an extension

Working alongside your architect and builder

We're used to working with architects, builders and interior designers, and we'll share our drawings with whoever needs them so everyone builds to the same plan. Our site survey can be timed around the building work, and for extensions it usually happens at first fix. If you're still putting your team together, Danil can introduce you to trades he trusts, from stonemasons to roofers and painters.

The Suga Promise

This is how every Suga kitchen is run, written down so you know exactly what to expect, from your first visit to a year after handover.

Before we order

A design brief built around how you live
Two surveys, including our 40-point check
Your written sign-off on drawings and specification before anything is ordered

While we fit

Our fitters, working to a written schedule
A call a week before to confirm delivery day and start time
Your fitter keeps you updated and leaves the room tidy every day

After handover

A check-up visit 12 months after handover
5-year workmanship guarantee
10-year guarantee on stone worktops
Manufacturer appliance guarantees of up to 10 years
KBSA Approved Member

Read our guarantees

Questions about kitchens for extensions

See all FAQs
When should I bring a kitchen designer into my extension?

At concept stage, before the planning and building regulations drawings are finished. That's when the position of the kitchen, the services and even the windows can still change easily. We can then give your architect a services overlay drawing and a zoning brief, and visit at first fix to check everything is where the design needs it.

If I have an architect, do I still need a kitchen designer?

Your architect designs the building, and we design the kitchen that goes in it, so the two work well side by side. We'll give your architect a services overlay drawing and a zoning brief showing where water, waste, gas, power and extraction need to be, so the build matches the kitchen design.

Is it too late if the extension is already built?

No. Most of our extension clients first get in touch once the shell is up. We'll survey the room as it actually is, measuring the walls, floor levels, ceiling heights and the position of every service, and design around it. Getting in touch before plastering means any services that need to move can still be moved cheaply.

How long does it take from design to installation?

Most kitchens are installed 8 to 14 weeks after you sign off the final design, depending on the brand. Once you've signed off, you'll get a written schedule, and we'll call a week before installation to confirm the details.

How much does a Suga kitchen cost?

It depends on the size of the room, the cabinetry and the appliances you choose. Our pricing guide shows real project costs at three levels of specification, so you can set a realistic budget. For a figure for your own kitchen, book a free design appointment.

Other kitchens with a particular brief

Kosher kitchen designed by Suga Küchen

Kosher kitchens

Layouts, storage and appliances planned around the way your household keeps kosher.

Explore kosher kitchens
Ceiling extractor set into a structural coffer above a kitchen island in Macclesfield

Designed it with AI?

Bring us the picture and we'll turn it into a kitchen that fits your room, with real cabinetry and real appliances.

Make your AI design real